CLIENT:
JP Elektroprivreda Srbije (Electrical Power Industry of Serbia)/ TPP Nikola Tesla Ltd.

PROJECT STATUS:
Completed

PROJECT VALUE:
5,615,272 EUR

DESCRIPTION OF THE PROJECT:
Turnkey

PROGRAM OF WORKS

  • Year of completion / handover to the Client – 2006.
  • End of Contract / end of guarantee period – 2007.

 

BASIC PROJECT FEATURES

Adaptation and rehabilitation of electrostatic precipitators and ash handling system in order to reduce emission of ash particles in the flue gas to less than 50 mg/Nm3

 

Basic Unit parameters: Power 210 MW – Lignite type of coal.

 

DESCRIPTION OF WORKS

Reconstruction of the electrostatic precipitator includes disassembling of the existing equipment and ash handling system, design, procurement, installation, testing and commissioning of the new equipment with related civil, mechanical and electrical works

 

 

ENVIRONMENTAL PROTECTION PROJECT

The realization of the project made it possible to increase the efficiency of the operation of the ESP Unit.

 

The project implementation resulted in a multiple reduction of the outlet flue gas dust concentration and increasing efficiency of plant operation, while meeting regulatory environmental requirements associated with maximum permissible dust emission levels less than 50 mg / Nm3.